# Interconnection Queue Data: CAISO, NYISO and BPA

Published generator interconnection queue records from CAISO, NYISO and BPA in one table, with project, fuel, capacity, status, location and proposed in-service date where published. The table contains 3,520 requests.

## About this dataset

Generator interconnection queue data from three US grid operators, merged into one table: the California ISO (CAISO), the New York ISO (NYISO) and the Bonneville Power Administration (BPA). Each operator publishes its interconnection queue in its own format, with its own columns and status labels. This dataset brings the published records into one shape. Each row is an interconnection request, identified by its operator and queue position, with project name, fuel type, capacity in MW, status, study process, location, point of interconnection, request date and proposed in-service date where published.

The table is intended for renewable and storage developers, investors, analysts and others tracking interconnection requests. It contains 3,520 requests across the published tables. A queued request is not a built plant, and operator status labels are not standardized.

Need the same table for PJM, MISO and ERCOT, or a tailored view of active solar and storage requests? Ask Jason to build your own version.

## What you can use it for

- Review requests by fuel type, capacity and location.
- Examine queued capacity for solar, battery storage, wind and gas where those details are published.
- Review request status and withdrawal information where published.
- Find projects by name or point of interconnection where those details are available.
- Review proposed in-service dates where published.

## Coverage

The dataset covers published interconnection queue records from CAISO, NYISO and BPA. It contains 3,520 rows across the published tables. The available summary does not provide a verified breakdown by operator, status or observation date.

## Sources

bpa.gov, caiso.com, nyiso.com

## Column explanations

- operator: the grid operator whose queue lists the request (CAISO, NYISO or BPA).
- queue_position: the request's queue number as published by the operator. Together with operator, it identifies a request.
- project_name: the project name as published; it may be blank.
- interconnection_customer: the developer, company or utility that filed the request, where stated.
- status: the status as published by the operator. Labels differ between operators.
- study_process: the study track as published.
- request_date: the request filing date, where stated.
- queue_date: the date the request entered the queue, where stated.
- withdrawn_date: the withdrawal date, where stated.
- proposed_in_service_date: the proposed in-service or on-line date, where stated; date precision may vary by operator.
- fuel_type: the fuel or technology as published.
- capacity_mw: requested capacity in MW, using the measure published by the operator.
- winter_mw: winter capacity in MW, where stated.
- state: the state code, where stated.
- county: the county, where stated.
- point_of_interconnection: the substation or line the project would connect to, where stated.
- transmission_owner: the utility or transmission owner, where stated.
- source_name: the operator file the row came from.
- source_url: link to the source file.
- source_updated_date: the update date shown in the operator's file, where available.
- first_seen_date: the date the request first appeared in this dataset, where available.

## Limitations

- Coverage is limited to CAISO, NYISO and BPA; these records are not US-wide totals.
- Load, transmission-only and local-load requests are outside the stated scope of this generator queue dataset.
- Values and status labels follow each operator's publication; labels are not mapped to a common scale, and fields may be missing.
- Some records may lack project names or other details.
- A queued request is not a built plant. Many requests may not reach operation.
- Operators publish updates on their own schedules. Confirm details with the operator's source before relying on a value.

## Licence

Get this sample data, free: CC BY 4.0. Use it for anything, including commercially, with credit to Jsonify. Credit it as: Data: Jsonify, CC BY 4.0, https://www.jsonify.com/datasets/us-generator-interconnection-queues-68fb9ee25003
https://creativecommons.org/licenses/by/4.0/

Or buy the full dataset: the complete current dataset as a one-off export under a commercial licence, priced per dataset; book a call for a quote (https://calendly.com/paulhunkin/30min).

Or collect your own: run this pipeline in your own Jsonify account, or book a live feed for your team (https://calendly.com/paulhunkin/30min). Data you collect is yours to use under your Jsonify terms (https://www.jsonify.com/legal/terms#delivered-dataset), with no credit line.

## Frequently asked questions

**Is this sample data free to use?**
Yes. The sample on this page is published under CC BY 4.0. You can use it in your own work, products and research, including commercially, as long as you credit Jsonify.

**How do I credit Jsonify?**
Put this line wherever you show or publish the data, and say if you changed it: Data: Jsonify, CC BY 4.0, https://www.jsonify.com/datasets/us-generator-interconnection-queues-68fb9ee25003

**Can I buy the full dataset?**
Yes. The complete current dataset, with its history on request, is available as a one-off export under a commercial licence: no credit line, yours to use in products and research. It is priced per dataset. Book a call for a quote.

**How is that different from collecting my own?**
The free sample is a slice of the data Jsonify collected, as of the date shown on this page. If you run the pipeline in your own Jsonify account, or have us run a live feed for you, the data you collect is yours to use under your Jsonify terms. It needs no credit line, and it stays current on your schedule.

**What do Download and Customize do?**
Both open a free Jsonify workspace of your own. Download puts this sample data in it, ready to export as CSV or JSON. Customize puts a copy of the pipeline in it, so you can change the sources, the rows it collects or the schedule.

**Does collecting my own cost anything?**
Your account includes free rows to start. Past that you pay for the rows you collect, as set out on the pricing page. Nothing is charged for the Download or Customize step itself.

**What does a live feed for my team include?**
Jsonify runs the pipeline for you on a schedule, sends change alerts, keeps the history, and adds the coverage you need. It is priced per team. Book a demo to scope it.

**I run a site this data was read from. What can I do?**
Jsonify reads public pages and credits each source. If something on this page should not be here, or you want your site left out of future runs, tell us and we will act on it. [Report a problem or request removal](https://www.jsonify.com/legal/site-owners).

Refresh: weekly.

- Active pipeline version: v2
- Schedule: weekly
- Pipeline updated: 23 Nov 2026
- Directory ID: 68fb9ee25003
- HTML page: https://www.jsonify.com/datasets/us-generator-interconnection-queues-68fb9ee25003

- Sample files (CSV, JSON, schema): https://github.com/jsonifyco/public-datasets/tree/main/datasets/us-generator-interconnection-queues-68fb9ee25003

## Pipeline steps

1. **Sources** (Sources): bpa.gov, caiso.com, nyiso.com
2. **Previous Requests** (Input): Previously saved requests, matched by operator and queue position for updates and preserved first-seen dates.
3. **Sources** (Step): Select the three official operator workbooks, with NYISO resolved from its current interconnections page.
4. **Read Workbooks** (Map): Read published Excel sheets, exclude load requests, and save normalized requests in batches of 100.
5. **Check Batches** (Step): Validate unique operator and queue keys and reserve the monthly allowance before saving small batches.
6. **Save Batches** (Map): Stream each merged batch of at most 100 requests into the same combined table.
7. **Requests** (Output): One request per operator and queue position from the published operator workbooks.

## Outputs

- **US generator interconnection queues**: requests (3,520 rows); revision 4, published 23 Nov 2026, produced by pipeline v2. One request per operator and queue position from the published operator workbooks.

## Preview: US generator interconnection queues / requests

| # | capacity\_mw | county | first\_seen\_date | fuel\_type | interconnection\_customer | operator | point\_of\_interconnection | project\_name | proposed\_in\_service\_date | queue\_date | queue\_position | request\_date | source\_name | source\_updated\_date | source\_url | state | status | study\_process | transmission\_owner | winter\_mw | withdrawn\_date |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
| 1 | 200 | Klickitat & Yakima | 2026-11-14 | Wind Turbine |  | BPA | New substation on BPA's 500 kV McNary-John Day line |  | 2011-10-01 |  | G0309 | 2008-01-29 | InterconnectionQueueOutput.xlsx | 2026-11-22 | https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx | WA | WITHDRAWN |  |  | 200 |  |
| 2 | 39 | Chautauqua | 2026-11-14 | W | Goldenrod Wind LLC | NYISO | Moon Road-Hartfield 115kV Line159 | Goldenrod Wind | 2029-06 |  | C24-225 | 2024-09-20 | NYISO-Interconnection-Queue-10312026.xlsx | 2026-06-30 | https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-10312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1794581737933 | NY | 7 | Cluster Projects | NM-NG | 39 |  |
| 3 | 300 | Columbia | 2026-11-14 | Wind Turbine | RES North America | BPA | Lower Monumental-Starbuck 500 kV line. | 300MW Lower Monumental-Starbuck | 2004-06-01 |  | G77 | 2001-09-21 | InterconnectionQueueOutput.xlsx | 2026-11-22 | https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx | WA | WITHDRAWN |  |  | 300 |  |
| 4 | 299 | Wasco | 2026-11-14 | Wind Turbine |  | BPA | BPA’s 230 kV Transmission Facilities in or close to Maupin Substation. |  | 2013-12-31 |  | G0401 | 2010-01-12 | InterconnectionQueueOutput.xlsx | 2026-11-22 | https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx | OR | WITHDRAWN |  |  | 299 |  |
| 5 | 1 | Deschutes | 2026-11-14 | Water | Three Sisters Irrigation District | BPA | 68000 Hwy 20 W, Bend, OR 97701 | Sisters Irrigation Hydro Project | 2013-09-03 |  | G0466 | 2011-10-04 | InterconnectionQueueOutput.xlsx | 2026-11-22 | https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx | OR | ENERGIZED |  |  | 1 |  |
| 6 | 44.8 | SAN JOAQUIN | 2026-11-14 | Wind Turbine |  | CAISO | Vasco-Herdlyn 60kV line | DYER SUMMIT WIND REPOWER |  | 2014-04-30 | 1010 | 2014-04-28 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | COMPLETED | C07 | PGAE |  |  |
| 7 | 540 | BAJA CALIFORNIA | 2026-11-14 | Wind Turbine |  | CAISO | ECO Sub 230 kV Bus | AUBANEL II WIND PROJECT | 2013-12-31 | 2010-07-31 | 643C | 2010-11-20 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | MX | WITHDRAWN | C03 | SDGE |  | 2010-11-01 |
| 8 | 200 | Deschutes | 2026-11-14 | Solar; Battery |  | BPA | LaPine Substation |  | 2028-11-01 |  | G0909 | 2023-07-18 | InterconnectionQueueOutput.xlsx | 2026-11-22 | https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx | OR | STUDY | Transition Cluster |  | 200 |  |
| 9 | 200 | Grant | 2026-11-14 | Solar |  | BPA | To be determined. |  | 2026-01-02 |  | G0767 | 2022-08-01 | InterconnectionQueueOutput.xlsx | 2026-11-22 | https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx | WA | WITHDRAWN | Transition Cluster |  | 200 |  |
| 10 | 127 | Douglas | 2026-11-14 | Wind Turbine |  | BPA | to be determind |  | 2008-06-01 |  | G0225 | 2006-05-18 | InterconnectionQueueOutput.xlsx | 2026-11-22 | https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx | WA | WITHDRAWN |  |  | 127 |  |
| 11 | 275 | Garfield | 2026-11-14 | Solar |  | BPA | Central Ferry Substation |  | 2022-12-15 |  | G0603 | 2018-10-19 | InterconnectionQueueOutput.xlsx | 2026-11-22 | https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx | WA | WITHDRAWN |  |  | 275 |  |
| 12 | 150 | SOLANO | 2026-11-14 | Battery |  | CAISO | Birds Landing Substation 230kV | WINDCHARGER ESS | 2021-12-01 | 2018-04-16 | 1492 | 2018-04-12 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | C11 | PGAE |  | 2021-04-09 |
| 13 | 100 | SAN DIEGO | 2026-11-14 | Battery |  | CAISO | Ocean Ranch Substation 69 kV | TOWER 1 ENERGY STORAGE | 2029-02-05 | 2021-04-15 | 2165 | 2021-04-06 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | C14 | SDGE |  | 2025-09-08 |
| 14 | 315 | Benton | 2026-11-14 | Battery |  | BPA | Wine Country-Midway No 1 230 kV line. |  | 2026-06-01 |  | G0799 | 2022-08-18 | InterconnectionQueueOutput.xlsx | 2026-11-22 | https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx | WA | WITHDRAWN | Transition Cluster |  | 315 |  |
| 15 | 80 | COLUSA | 2026-11-14 | Battery; Solar |  | CAISO | Cortina 60 kV | JANUS | 2027-04-01 | 2018-04-16 | 1455 | 2018-04-12 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | ACTIVE | C11 | PGAE |  |  |
| 16 | 3 | KERN | 2026-11-14 | Solar |  | CAISO | Whirlwind Substation | RE GARLAND |  | 2020-05-13 | 1680 | 2020-01-29 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | COMPLETED | FT | SCE |  |  |
| 17 | 150 | SAN BERNARDINO | 2026-11-14 | Battery; Solar |  | CAISO | Kramer Substation 230kV | LOCKHART SOLAR 2 |  | 2019-04-15 | 1617 | 2019-04-05 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | COMPLETED | C12 | SCE |  |  |
| 18 | 150 | Jefferson | 2026-11-14 | S | Bay Breeze Solar, LLC | NYISO | North Watertown (Lyme Junction)-Lyme Line 13 115 kV | Bay Breeze solar | 2029-09 |  | C24-217 | 2024-09-20 | NYISO-Interconnection-Queue-10312026.xlsx | 2026-01-31 | https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-10312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1794581737933 | NY | 7 | Cluster Projects | NM-NG | 150 |  |
| 19 | 483 | KERN | 2026-11-14 | Solar; Wind Turbine |  | CAISO | SCE Highwind Substation 230kV | CALAVERAS WIND PROJECT (100/383MW) | 2015-05-01 | 2011-03-31 | 681 | 2011-03-31 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | C04 | SCE |  | 2012-02-23 |
| 20 | 150 | KERN | 2026-11-14 | Wind Turbine |  | CAISO | Highwind Substation 230kV | RED MOUNTAIN RIDGE | 2012-12-31 | 2008-05-30 | 409 | 2008-05-30 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | TC | SCE |  | 2012-04-24 |
| 21 | 7.6 | Clallam | 2026-11-14 | Biofuel | Nippon Paper Industries USA Co., Ltd. | BPA | At the 69kV bus in BPA's Port Angeles Substation. | Nippon Biomass | 2012-04-30 |  | G0419 | 2010-04-01 | InterconnectionQueueOutput.xlsx | 2026-11-22 | https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx | WA | ENERGIZED |  |  | 7.6 |  |
| 22 |  | Suffolk | 2026-11-14 | O | National Grid Generation, LLC | NYISO | West Babylon 13.8 kV | West Babylon Internal Combustion (IC), Unit 4 |  |  | CR24-1002 | 2024-09-27 | NYISO-Interconnection-Queue-10312026.xlsx | 2025-02-28 | https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-10312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1794581737933 | NY | 7 | Cluster Projects | LIPA |  |  |
| 23 | 249 | Klickitat | 2026-11-14 | Wind Turbine | Pacific Winds, Inc. | BPA | 230/kV McNary - Horse Heaven/ 345 kV McNary - Ross line | Pacific Winds Inc | 2003-03-31 |  | G50 | 2001-04-23 | InterconnectionQueueOutput.xlsx | 2026-11-22 | https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx | WA | WITHDRAWN |  |  | 249 |  |
| 24 | 202 | Morrow | 2026-11-14 | Wind Turbine |  | BPA | Boardman Substation |  | 2010-09-01 |  | G0241 | 2006-10-10 | InterconnectionQueueOutput.xlsx | 2026-11-22 | https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx | OR | WITHDRAWN |  |  | 202 |  |
| 25 | 60 | SAN BERNARDINO | 2026-11-14 | Solar; Battery |  | CAISO | Tortilla Substation 115 kV | RED DIAMOND SOLAR | 2028-04-10 | 2021-04-15 | 2108 | 2021-09-30 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | C14 | SCE |  | 2023-01-03 |
| 26 | 80 | Linn | 2026-11-14 | Biofuel; Battery |  | BPA | Forest Grove-McMinnville No 1 115kV line. |  | 2030-12-02 |  | G0886 | 2023-06-30 | InterconnectionQueueOutput.xlsx | 2026-11-22 | https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx | OR | STUDY | Transition Cluster |  | 80 |  |
| 27 | 1400 | RIVERSIDE | 2026-11-14 | Water |  | CAISO | Red Bluff Substation 230kV | EAGLE MOUNTAIN PUMP STORAGE #3 | 2017-07-01 | 2011-03-31 | 697 | 2011-03-31 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | C04 | SCE |  | 2012-01-13 |
| 28 | 500 | Klickitat | 2026-11-14 | Solar; Battery |  | BPA | Knight Substation |  | 2026-06-15 |  | G0846 | 2023-02-22 | InterconnectionQueueOutput.xlsx | 2026-11-22 | https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx | WA | WITHDRAWN |  |  | 500 |  |
| 29 | 750 | SAN DIEGO | 2026-11-14 | Natural Gas |  | CAISO | Sycamore Canyon Substation | SAN DIEGO COMMUNITY POWER GENERATING STATION | 2010-12-31 | 2000-11-28 | 8 | 2000-11-28 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | Pre- Amend. 39 | SDGE |  |  |
| 30 | 265 | Lane | 2026-11-14 | Natural Gas | Frontier Technology, Inc | BPA | Marion-Lane No. 1 500 kV transmission line near Colburg | Frontier Technology | 2003-08-01 |  | G36 | 2001-03-16 | InterconnectionQueueOutput.xlsx | 2026-11-22 | https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx | OR | WITHDRAWN |  |  | 265 |  |
| 31 | 100 | KERN | 2026-11-14 | Wind Turbine |  | CAISO | Whirlwind Substation 230kV | KEYHOLE WIND 2 | 2024-12-01 | 2020-04-15 | 1785 | 2020-04-06 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | C13 | SCE |  | 2020-06-25 |
| 32 | 49 | ORANGE | 2026-11-14 | Natural Gas |  | CAISO | Talega San Mateo 69kV line | WELLHEAD POWER CLEMENTE | 2009-07-01 | 2008-05-30 | 446 | 2008-05-30 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | Serial LGIP | SDGE |  | 2008-11-25 |
| 33 | 500 | RIVERSIDE | 2026-11-14 | Battery; Solar |  | CAISO | Colorado River Substation 500kV | SOLO | 2022-12-31 | 2019-04-15 | 1637 | 2019-04-05 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | C12 | SCE |  | 2020-03-26 |
| 34 | 11 | SAN JOAQUIN | 2026-11-14 | Natural Gas |  | CAISO | Tesla - Stockton Co-Gen Jct 115 kV Line | RIPON LM6000 REPOWER | 2018-09-01 | 2012-04-02 | 883 | 2012-03-28 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | C05 | PGAE |  | 2012-06-22 |
| 35 | 400 | SAN LUIS OBISPO | 2026-11-14 | Battery |  | CAISO | Caliente Switching Station 230 kV | HIGH PLAINS STORAGE | 2024-04-01 | 2021-04-15 | 1997 | 2021-04-09 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | C14 | PGAE |  | 2022-12-18 |
| 36 | 20 | Polk | 2026-11-14 | Solar |  | BPA | 45.005049, -123.336683 |  | 2028-06-15 |  | G1084 | 2025-08-11 | InterconnectionQueueOutput.xlsx | 2026-11-22 | https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx | OR | WITHDRAWN |  |  | 20 |  |
| 37 | 50 | Schuyler | 2026-11-14 | W | Azalea Wind LLC | NYISO | Montour Falls to Coddington Road 115kV | Azalea Wind 2 | 2029-06 |  | C24-370 | 2024-10-15 | NYISO-Interconnection-Queue-10312026.xlsx | 2026-06-30 | https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-10312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1794581737933 | NY | 7 | Cluster Projects | NYSEG | 50 |  |
| 38 | 315 | SAN JOAQUIN | 2026-11-14 | Natural Gas |  | CAISO | Loop Tesla Stagg and Tesla-Eight Mile 230 kV lines | ISLAND ENERGY CENTER | 2012-07-01 | 2008-05-27 | 373 | 2008-05-27 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | Serial LGIP | PGAE |  | 2008-11-26 |
| 39 | 150 | IMPERIAL | 2026-11-14 | Solar; Battery |  | CAISO | Imperial Valley Substation 230 kV | SUNRISE BUTTE | 2027-01-18 | 2019-04-15 | 1667 | 2019-04-12 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | ACTIVE | C12 | SDGE |  |  |
| 40 | 200 | FRESNO | 2026-11-14 | Solar; Battery |  | CAISO | Tranquility 230 kV | SONRISA | 2026-12-31 | 2017-05-01 | 1391 | 2017-04-29 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | ACTIVE | C10 | PGAE |  |  |
| 41 | 80 | Wasco | 2026-11-14 | Wind Turbine |  | BPA |  |  | 2008-06-30 |  | G0228 | 2006-06-27 | InterconnectionQueueOutput.xlsx | 2026-11-22 | https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx | OR | WITHDRAWN |  |  | 80 |  |
| 42 | 125 | HUMBOLDT | 2026-11-14 | Wind Turbine |  | CAISO | Bridgeville 115 kV | CAPETOWN HYBRID | 2022-09-15 | 2016-05-02 | 1269 | 2016-04-29 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | C09 | PGAE |  | 2020-03-30 |
| 43 | 20 | Lake | 2026-11-14 | Solar | NewSun Energy Transmission Company LLC | BPA | Within 10 miles of Midstate Electric's Fort Rock 115 kV Substation. | NewSun Fort Rock Project | 2019-01-31 |  | G0521 | 2016-01-07 | InterconnectionQueueOutput.xlsx | 2026-11-22 | https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx | OR | ENERGIZED |  |  | 20 |  |
| 44 | 131 | CONTRA COSTA | 2026-11-14 | Natural Gas |  | CAISO | Contra Costa Substation 230kV bus | CONTRA COSTA GENERATING STATION EXPANSION | 2017-12-31 | 2009-07-31 | 507 | 2010-12-01 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | C01 | PGAE |  | 2009-12-04 |
| 45 | 120 | KERN/INYO | 2026-11-14 | Wind Turbine |  | CAISO | Control-Haiwee-Inyokern 115kV line | LITTLE LAKE SOUTH WIND FARM | 2010-12-15 | 2007-07-16 | 244 | 2007-07-16 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | Serial LGIP | SCE |  | 2008-11-26 |
| 46 | 1000 | BAJA CALIFORNIA | 2026-11-14 | Wind Turbine |  | CAISO | Imperial Valley 500kV bus | VIENTO MEXICANA | 2011-12-31 | 2007-02-02 | 168 | 2007-02-01 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | MX | WITHDRAWN | Serial LGIP | SDGE |  | 2011-03-31 |
| 47 | 200 | LOS ANGELES | 2026-11-14 | Solar |  | CAISO | El Sequndo 230kV Switchyard | EL SEGUNDO 3 & 4 RE-POWER II | 2013-01-30 | 2007-04-23 | 206 | 2007-04-26 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | Serial LGIP | SCE |  | 2007-06-20 |
| 48 | 99.995 | MERCED/FRESNO | 2026-11-14 | Solar; Battery |  | CAISO | Mercy Springs 70kV | POLELINE SOLAR ENERGY CENTER | 2021-12-01 | 2018-04-16 | 1505 | 2018-04-16 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | C11 | PGAE |  | 2019-04-30 |
| 49 | 20 | Greene | 2026-11-14 | S | Hecate Energy Greene 1 LLC | NYISO | Coxsackie - North Catskill 69kV | Greene County 1 | 2028-08 |  | 0572 | 2016-09-06 | NYISO-Interconnection-Queue-10312026.xlsx | 2026-09-30 | https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-10312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1794581737933 | NY | 11 |  | CHG&E | 20 |  |
| 50 | 80 | FRESNO | 2026-11-14 | Battery; Solar |  | CAISO | Panoche Substation 115kV | HUDSON SOLAR 2 | 2022-06-30 | 2018-04-16 | 1478 | 2018-04-12 | publicqueuereport.xlsx | 2026-11-23 | https://www.caiso.com/documents/publicqueuereport.xlsx | CA | WITHDRAWN | C11 | PGAE |  | 2019-03-07 |

Automatic sample of 50 rows from the current data: 50 of 3,520 rows from revision 4.

## Version history

- v1 (14 Nov 2026): Created the hidden initial generator queue snapshot with source blanks retained and load requests excluded.
- v2 (14 Nov 2026): Corrected NYISO proposed months and last-updated dates, switched CAISO to current online dates, and added keyed updates that preserve first-seen dates.

## Repairs

No repairs needed so far.

## Latest quality checks

- v2 (14 Nov 2026) **Passed**: All 3,520 requests passed structural checks and matched the official workbooks on keys and selected substantive fields. No defects found. — 1 table, 22 rows inspected
- v1 (14 Nov 2026) **Inconclusive**: Quality assessment could not complete.

## Related datasets

- [Drilling Permits: New Oil and Gas Permits in TX, OK and CO](https://www.jsonify.com/datasets/us-approved-drilling-permits-bbab01ba75f7.md): A combined table of drilling permits published by the Texas RRC, Oklahoma OCC and Colorado ECMC, with operator, county, depth, well type and approval date.
- [eBay sold listings data: Pokémon card prices dataset](https://www.jsonify.com/datasets/ebay-us-pok-mon-sold-listings-9c1de2dcf5cc.md): eBay US sold listings for Pokémon cards, with displayed sold price, shipping, sold date, listing format and Best Offer status.
- [Portugal Insolvency Notices](https://www.jsonify.com/datasets/insolvency-notices-pt-5cf39e22f64e.md): Public Citius insolvency notices for Lisboa and Porto, with debtor, court, publication date and published deadline details.


## Related on Jsonify

- [The best data extraction tools in 2026, by job](https://www.jsonify.com/blog/best-data-extraction-tools-2026.md)
- [How Jason builds and maintains data pipelines](https://www.jsonify.com/product.md)