Interconnection Queue Data: CAISO, NYISO and BPA

One request per operator and queue position from the published operator workbooks.

Last published
Refresh
Weekly
Current requests
3,520
Licence
Free sampleCC BY 4.0Fork and collectCommercial
Sample
View on GitHub
ShareLinkedInX
# dataIllustrated from this pipeline
  1. you

    @Jason build this dataset: published generator interconnection queue records from CAISO, NYISO and BPA in one table, with project, fuel, capacity, status, location and proposed in-service date where published. The table contains 3,520 requests. Refreshed weekly.

  2. JasonApp

    On it. Reading bpa.govcaiso.comnyiso.com.

  3. JasonApp

    3,520 requests, 21 columns in this dataset.

3,520 requests, refreshed weekly

Sample · 50 rows

You’re viewing a sample of this dataset.

Row#
Open row
1200Klickitat & Yakima2026-11-14Wind Turbine—BPANew substation on BPA's 500 kV McNary-John Day line—2011-10-01—G03092008-01-29InterconnectionQueueOutput.xlsx2026-11-22bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsxWAWITHDRAWN——200—View row
239Chautauqua2026-11-14WGoldenrod Wind LLCNYISOMoon Road-Hartfield 115kV Line159Goldenrod Wind2029-06—C24-2252024-09-20NYISO-Interconnection-Queue-10312026.xlsx2026-06-30nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-10312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1794581737933NY7Cluster ProjectsNM-NG39—View row
3300Columbia2026-11-14Wind TurbineRES North AmericaBPALower Monumental-Starbuck 500 kV line.300MW Lower Monumental-Starbuck2004-06-01—G772001-09-21InterconnectionQueueOutput.xlsx2026-11-22bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsxWAWITHDRAWN——300—View row
4299Wasco2026-11-14Wind Turbine—BPABPA’s 230 kV Transmission Facilities in or close to Maupin Substation.—2013-12-31—G04012010-01-12InterconnectionQueueOutput.xlsx2026-11-22bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsxORWITHDRAWN——299—View row
51Deschutes2026-11-14WaterThree Sisters Irrigation DistrictBPA68000 Hwy 20 W, Bend, OR 97701Sisters Irrigation Hydro Project2013-09-03—G04662011-10-04InterconnectionQueueOutput.xlsx2026-11-22bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsxORENERGIZED——1—View row
644.8SAN JOAQUIN2026-11-14Wind Turbine—CAISOVasco-Herdlyn 60kV lineDYER SUMMIT WIND REPOWER—2014-04-3010102014-04-28publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCACOMPLETEDC07PGAE——View row
7540BAJA CALIFORNIA2026-11-14Wind Turbine—CAISOECO Sub 230 kV BusAUBANEL II WIND PROJECT2013-12-312010-07-31643C2010-11-20publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxMXWITHDRAWNC03SDGE—2010-11-01View row
8200Deschutes2026-11-14Solar; Battery—BPALaPine Substation—2028-11-01—G09092023-07-18InterconnectionQueueOutput.xlsx2026-11-22bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsxORSTUDYTransition Cluster—200—View row
9200Grant2026-11-14Solar—BPATo be determined.—2026-01-02—G07672022-08-01InterconnectionQueueOutput.xlsx2026-11-22bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsxWAWITHDRAWNTransition Cluster—200—View row
10127Douglas2026-11-14Wind Turbine—BPAto be determind—2008-06-01—G02252006-05-18InterconnectionQueueOutput.xlsx2026-11-22bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsxWAWITHDRAWN——127—View row
11275Garfield2026-11-14Solar—BPACentral Ferry Substation—2022-12-15—G06032018-10-19InterconnectionQueueOutput.xlsx2026-11-22bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsxWAWITHDRAWN——275—View row
12150SOLANO2026-11-14Battery—CAISOBirds Landing Substation 230kVWINDCHARGER ESS2021-12-012018-04-1614922018-04-12publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNC11PGAE—2021-04-09View row
13100SAN DIEGO2026-11-14Battery—CAISOOcean Ranch Substation 69 kVTOWER 1 ENERGY STORAGE2029-02-052021-04-1521652021-04-06publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNC14SDGE—2025-09-08View row
14315Benton2026-11-14Battery—BPAWine Country-Midway No 1 230 kV line.—2026-06-01—G07992022-08-18InterconnectionQueueOutput.xlsx2026-11-22bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsxWAWITHDRAWNTransition Cluster—315—View row
1580COLUSA2026-11-14Battery; Solar—CAISOCortina 60 kVJANUS2027-04-012018-04-1614552018-04-12publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAACTIVEC11PGAE——View row
163KERN2026-11-14Solar—CAISOWhirlwind SubstationRE GARLAND—2020-05-1316802020-01-29publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCACOMPLETEDFTSCE——View row
17150SAN BERNARDINO2026-11-14Battery; Solar—CAISOKramer Substation 230kVLOCKHART SOLAR 2—2019-04-1516172019-04-05publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCACOMPLETEDC12SCE——View row
18150Jefferson2026-11-14SBay Breeze Solar, LLCNYISONorth Watertown (Lyme Junction)-Lyme Line 13 115 kVBay Breeze solar2029-09—C24-2172024-09-20NYISO-Interconnection-Queue-10312026.xlsx2026-01-31nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-10312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1794581737933NY7Cluster ProjectsNM-NG150—View row
19483KERN2026-11-14Solar; Wind Turbine—CAISOSCE Highwind Substation 230kVCALAVERAS WIND PROJECT (100/383MW)2015-05-012011-03-316812011-03-31publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNC04SCE—2012-02-23View row
20150KERN2026-11-14Wind Turbine—CAISOHighwind Substation 230kVRED MOUNTAIN RIDGE2012-12-312008-05-304092008-05-30publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNTCSCE—2012-04-24View row
217.6Clallam2026-11-14BiofuelNippon Paper Industries USA Co., Ltd.BPAAt the 69kV bus in BPA's Port Angeles Substation.Nippon Biomass2012-04-30—G04192010-04-01InterconnectionQueueOutput.xlsx2026-11-22bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsxWAENERGIZED——7.6—View row
22—Suffolk2026-11-14ONational Grid Generation, LLCNYISOWest Babylon 13.8 kVWest Babylon Internal Combustion (IC), Unit 4——CR24-10022024-09-27NYISO-Interconnection-Queue-10312026.xlsx2025-02-28nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-10312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1794581737933NY7Cluster ProjectsLIPA——View row
23249Klickitat2026-11-14Wind TurbinePacific Winds, Inc.BPA230/kV McNary - Horse Heaven/ 345 kV McNary - Ross linePacific Winds Inc2003-03-31—G502001-04-23InterconnectionQueueOutput.xlsx2026-11-22bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsxWAWITHDRAWN——249—View row
24202Morrow2026-11-14Wind Turbine—BPABoardman Substation—2010-09-01—G02412006-10-10InterconnectionQueueOutput.xlsx2026-11-22bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsxORWITHDRAWN——202—View row
2560SAN BERNARDINO2026-11-14Solar; Battery—CAISOTortilla Substation 115 kVRED DIAMOND SOLAR2028-04-102021-04-1521082021-09-30publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNC14SCE—2023-01-03View row
2680Linn2026-11-14Biofuel; Battery—BPAForest Grove-McMinnville No 1 115kV line.—2030-12-02—G08862023-06-30InterconnectionQueueOutput.xlsx2026-11-22bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsxORSTUDYTransition Cluster—80—View row
271,400RIVERSIDE2026-11-14Water—CAISORed Bluff Substation 230kVEAGLE MOUNTAIN PUMP STORAGE #32017-07-012011-03-316972011-03-31publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNC04SCE—2012-01-13View row
28500Klickitat2026-11-14Solar; Battery—BPAKnight Substation—2026-06-15—G08462023-02-22InterconnectionQueueOutput.xlsx2026-11-22bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsxWAWITHDRAWN——500—View row
29750SAN DIEGO2026-11-14Natural Gas—CAISOSycamore Canyon SubstationSAN DIEGO COMMUNITY POWER GENERATING STATION2010-12-312000-11-2882000-11-28publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNPre- Amend. 39SDGE——View row
30265Lane2026-11-14Natural GasFrontier Technology, IncBPAMarion-Lane No. 1 500 kV transmission line near ColburgFrontier Technology2003-08-01—G362001-03-16InterconnectionQueueOutput.xlsx2026-11-22bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsxORWITHDRAWN——265—View row
31100KERN2026-11-14Wind Turbine—CAISOWhirlwind Substation 230kVKEYHOLE WIND 22024-12-012020-04-1517852020-04-06publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNC13SCE—2020-06-25View row
3249ORANGE2026-11-14Natural Gas—CAISOTalega San Mateo 69kV lineWELLHEAD POWER CLEMENTE2009-07-012008-05-304462008-05-30publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNSerial LGIPSDGE—2008-11-25View row
33500RIVERSIDE2026-11-14Battery; Solar—CAISOColorado River Substation 500kVSOLO2022-12-312019-04-1516372019-04-05publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNC12SCE—2020-03-26View row
3411SAN JOAQUIN2026-11-14Natural Gas—CAISOTesla - Stockton Co-Gen Jct 115 kV LineRIPON LM6000 REPOWER2018-09-012012-04-028832012-03-28publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNC05PGAE—2012-06-22View row
35400SAN LUIS OBISPO2026-11-14Battery—CAISOCaliente Switching Station 230 kVHIGH PLAINS STORAGE2024-04-012021-04-1519972021-04-09publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNC14PGAE—2022-12-18View row
3620Polk2026-11-14Solar—BPA45.005049, -123.336683—2028-06-15—G10842025-08-11InterconnectionQueueOutput.xlsx2026-11-22bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsxORWITHDRAWN——20—View row
3750Schuyler2026-11-14WAzalea Wind LLCNYISOMontour Falls to Coddington Road 115kVAzalea Wind 22029-06—C24-3702024-10-15NYISO-Interconnection-Queue-10312026.xlsx2026-06-30nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-10312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1794581737933NY7Cluster ProjectsNYSEG50—View row
38315SAN JOAQUIN2026-11-14Natural Gas—CAISOLoop Tesla Stagg and Tesla-Eight Mile 230 kV linesISLAND ENERGY CENTER2012-07-012008-05-273732008-05-27publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNSerial LGIPPGAE—2008-11-26View row
39150IMPERIAL2026-11-14Solar; Battery—CAISOImperial Valley Substation 230 kVSUNRISE BUTTE2027-01-182019-04-1516672019-04-12publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAACTIVEC12SDGE——View row
40200FRESNO2026-11-14Solar; Battery—CAISOTranquility 230 kVSONRISA2026-12-312017-05-0113912017-04-29publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAACTIVEC10PGAE——View row
4180Wasco2026-11-14Wind Turbine—BPA——2008-06-30—G02282006-06-27InterconnectionQueueOutput.xlsx2026-11-22bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsxORWITHDRAWN——80—View row
42125HUMBOLDT2026-11-14Wind Turbine—CAISOBridgeville 115 kVCAPETOWN HYBRID2022-09-152016-05-0212692016-04-29publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNC09PGAE—2020-03-30View row
4320Lake2026-11-14SolarNewSun Energy Transmission Company LLCBPAWithin 10 miles of Midstate Electric's Fort Rock 115 kV Substation.NewSun Fort Rock Project2019-01-31—G05212016-01-07InterconnectionQueueOutput.xlsx2026-11-22bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsxORENERGIZED——20—View row
44131CONTRA COSTA2026-11-14Natural Gas—CAISOContra Costa Substation 230kV busCONTRA COSTA GENERATING STATION EXPANSION2017-12-312009-07-315072010-12-01publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNC01PGAE—2009-12-04View row
45120KERN/INYO2026-11-14Wind Turbine—CAISOControl-Haiwee-Inyokern 115kV lineLITTLE LAKE SOUTH WIND FARM2010-12-152007-07-162442007-07-16publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNSerial LGIPSCE—2008-11-26View row
461,000BAJA CALIFORNIA2026-11-14Wind Turbine—CAISOImperial Valley 500kV busVIENTO MEXICANA2011-12-312007-02-021682007-02-01publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxMXWITHDRAWNSerial LGIPSDGE—2011-03-31View row
47200LOS ANGELES2026-11-14Solar—CAISOEl Sequndo 230kV SwitchyardEL SEGUNDO 3 & 4 RE-POWER II2013-01-302007-04-232062007-04-26publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNSerial LGIPSCE—2007-06-20View row
4899.995MERCED/FRESNO2026-11-14Solar; Battery—CAISOMercy Springs 70kVPOLELINE SOLAR ENERGY CENTER2021-12-012018-04-1615052018-04-16publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNC11PGAE—2019-04-30View row
4920Greene2026-11-14SHecate Energy Greene 1 LLCNYISOCoxsackie - North Catskill 69kVGreene County 12028-08—05722016-09-06NYISO-Interconnection-Queue-10312026.xlsx2026-09-30nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-10312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1794581737933NY11—CHG&E20—View row
5080FRESNO2026-11-14Battery; Solar—CAISOPanoche Substation 115kVHUDSON SOLAR 22022-06-302018-04-1614782018-04-12publicqueuereport.xlsx2026-11-23caiso.com/documents/publicqueuereport.xlsxCAWITHDRAWNC11PGAE—2019-03-07View row
3,520 rows × 21 columns
Get this sample as CSV or JSONFree. It opens in a workspace of your own, ready to export. Takes a minute.

About this dataset

Generator interconnection queue data from three US grid operators, merged into one table: the California ISO (CAISO), the New York ISO (NYISO) and the Bonneville Power Administration (BPA). Each operator publishes its interconnection queue in its own format, with its own columns and status labels. This dataset brings the published records into one shape. Each row is an interconnection request, identified by its operator and queue position, with project name, fuel type, capacity in MW, status, study process, location, point of interconnection, request date and proposed in-service date where published. The table is intended for renewable and storage developers, investors, analysts and others tracking interconnection requests. It contains 3,520 requests across the published tables. A queued request is not a built plant, and operator status labels are not standardized. Need the same table for PJM, MISO and ERCOT, or a tailored view of active solar and storage requests? Ask Jason to build your own version.

What you can use it for

- Review requests by fuel type, capacity and location. - Examine queued capacity for solar, battery storage, wind and gas where those details are published. - Review request status and withdrawal information where published. - Find projects by name or point of interconnection where those details are available. - Review proposed in-service dates where published.

Coverage

The dataset covers published interconnection queue records from CAISO, NYISO and BPA. It contains 3,520 rows across the published tables. The available summary does not provide a verified breakdown by operator, status or observation date.

Delivery options

How Jsonify collected this data

Nobody wrote a scraper for this. Someone described the data they wanted, in a sentence, and Jason, Jsonify's AI data engineer, took it from there.

The illustration shows this pipeline’s saved steps and published data.

This pipeline refreshes weekly.

# dataIllustrated from this pipeline
  1. you

    @Jason I need this data: Published generator interconnection queue records from CAISO, NYISO and BPA in one table, with project, fuel, capacity, status, location and proposed in-service date where published. The table contains 3,520 requests.

    Look at bpa.gov, caiso.com and nyiso.com.

  2. JasonApp

    Pipeline steps:

    • Sources
    • Read Workbooks
    • Check Batches
    • Save Batches
    • Scheduled weekly

    Done. 3,520 requests published as v2:

    · Klickitat & Yakima200

    Goldenrod Wind · Chautauqua39

Message #data

What Jason built

The pipeline itself, and the record of every version, repair and quality check since.

Data pipeline

SourcesPrevious RequestsPrevious Requests — Previously saved requests, matched by operator and queue position for updates and preserved first-seen dates.
Input
Previous Requests
Previously saved requests, matched by operator and queue position for updates and preserved first-seen dates.
Sources — Select the three official operator workbooks, with NYISO resolved from its current interconnections page.
Step
Sources
Select the three official operator workbooks, with NYISO resolved from its current interconnections page.
Start
Read Workbooks — Read published Excel sheets, exclude load requests, and save normalized requests in batches of 100.
Fan out
Read Workbooks
Read published Excel sheets, exclude load requests, and save normalized requests in batches of 100.
Check Batches — Validate unique operator and queue keys and reserve the monthly allowance before saving small batches.
Step
Check Batches
Validate unique operator and queue keys and reserve the monthly allowance before saving small batches.
Save Batches — Stream each merged batch of at most 100 requests into the same combined table.
Fan out
Save Batches
Stream each merged batch of at most 100 requests into the same combined table.
Requests — One request per operator and queue position from the published operator workbooks.
Output
Requests
One request per operator and queue position from the published operator workbooks.
End
Sources — bpa.gov, caiso.com, nyiso.com
Sources
bpa.gov, caiso.com, nyiso.com
  1. 01 · sources

    Sources

    bpa.gov, caiso.com, nyiso.com

  2. 02 · input

    Previous Requests

    Previously saved requests, matched by operator and queue…

  3. 03

    Sources

    Select the three official operator workbooks, with NYISO…

  4. 04 · fan out

    Read Workbooks

    Read published Excel sheets, exclude load requests, and save…

  5. 05

    Check Batches

    Validate unique operator and queue keys and reserve the…

  6. 06 · fan out

    Save Batches

    Stream each merged batch of at most 100 requests into the same…

  7. 07 · output

    Requests

    One request per operator and queue position from the published…

    3,520 requests · v2

Ready to start?

Get this sample data, free

Jsonify collected this sample and publishes it under CC BY 4.0. Use it for anything, including commercially, as long as you credit Jsonify with a link to this page.

Credit it asData: Jsonify, CC BY 4.0, https://www.jsonify.com/datasets/us-generator-interconnection-queues-68fb9ee25003

The licence covers the dataset as Jsonify compiled it. It grants no rights in the source websites’ own content or trademarks.

Or buy the full dataset

The complete current dataset (3,520 requests), with its history, as a one-off export under a commercial licence.

  • Commercial use, no credit line. Yours to use in products, research and resale analysis.
  • Every row, every column. Not the sample: the whole dataset as of the day you buy it, plus past versions on request.
  • CSV, JSON or your warehouse. Delivered once, with the schema and source URLs.

Priced per dataset.

Or collect your own

Fork this pipeline into your own Jsonify account and run it yourself, or have us run a live feed for your team.

  • Commercial use, no credit line. Data you collect is yours under your Jsonify terms.
  • Kept current. It runs on your schedule, and Jason repairs it when a source changes.
  • Change alerts. Hear about new and changed rows in Slack, Teams or email.
  • Delivered where you work. Google Sheets, Excel, Snowflake, Postgres, S3 and more.
  • Your changes. Different sources, columns or coverage: tell Jason what to change.

100 free rows a month, then pay per row. See pricing

Frequently asked questions

Is this sample data free to use?
Yes. The sample on this page is published under CC BY 4.0. You can use it in your own work, products and research, including commercially, as long as you credit Jsonify.
How do I credit Jsonify?
Put this line wherever you show or publish the data, and say if you changed it: Data: Jsonify, CC BY 4.0, https://www.jsonify.com/datasets/us-generator-interconnection-queues-68fb9ee25003
Can I buy the full dataset?
Yes. The complete current dataset (every request), with its history on request, is available as a one-off export under a commercial licence: no credit line, yours to use in products and research. It is priced per dataset. Book a call for a quote.
How is that different from collecting my own?
The free sample is a slice of the data Jsonify collected, as of the date shown on this page. If you run the pipeline in your own Jsonify account, or have us run a live feed for you, the data you collect is yours to use under your Jsonify terms. It needs no credit line, and it stays current on your schedule.
What do Download and Customize do?
Both open a free Jsonify workspace of your own. Download puts this sample data in it, ready to export as CSV or JSON. Customize puts a copy of the pipeline in it, so you can change the sources, the requests it collects or the schedule.
Does collecting my own cost anything?
Your account includes free rows to start. Past that you pay for the rows you collect, as set out on the pricing page. Nothing is charged for the Download or Customize step itself.
What does a live feed for my team include?
Jsonify runs the pipeline for you on a schedule, sends change alerts, keeps the history, and adds the coverage you need. It is priced per team. Book a demo to scope it.
I run a site this data was read from. What can I do?
Jsonify reads public pages and credits each source. If something on this page should not be here, or you want your site left out of future runs, tell us and we will act on it. Report a problem or request removal.

Need something different?

Describe it. Get verified rows, kept current.

Migrate from your current tool

Share what you run on your current tool today. Jason, Jsonify’s AI data engineer, reads it and proposes the same pipelines on Jsonify, with checks and repairs built in.

Don’t include passwords or API keys. Exports, task configs and screenshots can be attached in Jsonify on the next step. Privacy

Connect your data assistant

Build datasets and work with your data in Claude, ChatGPT, Copilot or another assistant.

Connect in Claude

  1. Open the Jsonify connector: Open on Claude.ai ↗
  2. Select Connect and sign in to Jsonify.
  3. In a chat, enable Jsonify under + → Connectors and describe the data you need.
Advanced

Team or Enterprise account? Your workspace owner enables Jsonify once for everyone from Admin settings → Connectors. Jsonify is a community connector in the directory — some admins allow those by default, some review them first.

No directory? Add it by hand: Settings → Connectors → + Add custom connector, name it Jsonify, paste the server URL below, then Connect.

Server URLhttps://factory.jsonify.com/mcp

Official Claude custom-connector guide ↗

Then say: “build me a dataset of competitor product prices and availability, refreshed daily”. Full instructions per client on /connect.

What data do you need?

Describe it in a sentence or two. Jason proposes the sources, fields, checks and schedule before anything runs.

Try
100 rows a month free. No credit card.